TitleProduct

Concrete Formwork (aluminum alloy)

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-13 06:35

  • Browse the number:

    169

Send an inquiries

Company Profile

Shanghai Newswan International Trading Co., Ltd.

By certification [File Integrity]

Contact:Mr. Zhiyuan(Mr.)  

Email:

Telephone:

Phone:

Area:Jiangsu

Address:Jiangsu

Website: http://higo-china.kskuntai.com/

Product Details


  Singular Advantage of HIGO Aluminum Frame Laminated Formwork
  • 1,HIGO Formwork Scaffolding System can effectively increase the product life of special-shaped slabs, helping investors to reduce costs as much as possible.

  • 2,Compared with Al-Alloy formwork, HIGO system is much lower in terms of lump sum.

  • 3,IGO has worked out the problem of special-shaped slabs existing in Al-Alloy formwork, thus can be applied in more circumstances.

  • 4,HIGO adopts 100 times of water-based formwork oil. Therefore, no maintenance is required, which can further cut down the cost of raw materials and labor.

    Aluminum Frame wood plywood formwork vs Conventional Formwork
     
    Compare Plywood Aluminum Frame Laminated Formwork
    Size Unordered Standardized
    KN 30KN/m² Uneven 60KN/m² Even
    Early Removal Hard to operate 3 formworks and 3 scaffoldings Easy to operate 1 formwork and 3 scaffoldings
    Cycle time 6-7 days , Long without guarantee 3.5-4 days , Short with guarantee/td>
    Efficiency 10-15 m²/day/person 30-50 m²/day/person
    Turnover 5-7 times with large waste and loss 100 times ( 600 times for aluminum frame) without waste and loss
    Labor Labor shortage; professional skill required Adequate service; proficiency required
    Quality Vulnerable, plastering required Invulnerable, shape at one time, no need to plastering, high quality
    Wastage Large waste No waste; recyclable
    Waste Large waste No waste
    Service charge 25-35RMB/ m² Lower than 25-27RMB/m²
    Cost reduction on plastering 0 15-25 RMB/m²
    Price on green construction 2RMB/m² 0
    Tower crane Dependent Independent
     
     
    Comparison on economic indicator of common formworks
     
    Compare San'an formwork Steel Shuttering Formwork Aluminum Formwork Aluminum Frame Laminated Formwork
    Material(mm) formwork Steel plate Al-Alloy plate Laminated plywood
    Thickness(mm) 13/15 5-6 4 12-15
    Weight(kg/m² ) 10.5 85-95 20-25 17-25
    Weight to load(kg/m² ) 30 80 60 60
    Cost(without strut and components) 60RMB 700RMB 1300RMB 800RMB
    Turnover 6 100 100-200 100-200
    Value for recycling No and additional cost on disposal Less More More
    Operation Hard Normal Easy Easy (without formwork oil)
    Cost on maintenance Low High Low Low
    Efficiency Low Normal High High
    Application        
            ()
    Dependence on machinery Partly dependent dependent independent independent

    HIGO Aluminum Frame Laminated Formwork Scaffolding System adopts one ecological and energy-reserved material of new generation developed independently-the polymer laminated bamboo-wood formwork and combines it with Al-Alloy system together. So it not just inherits all the advantages in the Al-Alloy shuttering system. What's more, adhesion caused by certain chemical reaction between aluminum formwork and concrete will not be a problem any more. At the same time, it is also a breakthrough explained by the highly-reduced cost.