TitleProduct

Table/Slab Formwork, Shuttering, Concrete Formwork of Lowest Labor Cost

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Hebei

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-22 13:47

  • Browse the number:

    182

Send an inquiries

Company Profile

Changli Xingminweiye Architecture Equipment Limited Corporation

By certification [File Integrity]

Contact:Miss Decy Meng(Mr.)  

Email:

Telephone:

Phone:

Area:Hebei

Address:Hebei

Website: http://qhdxmwy.kskuntai.com/

Product Details




we are the first company with the whole flow production in China with patent products.
every year cooperate with governent, and big construction projects in China.
I am confident to say XM products can be reused 300 times, after testing.
EXPORT COUNTRIES


1.slab formwork
Product Name length package Qty(pcs) wall thickness
No.1 Main beam 2.68-4.39 20.8kg 2.0mm
No.2 Main beam 2.28-3.68 17.6kg 2.0mm
No.3 Main beam 1.77-2.88 13.55kg 2.0mm
No.4 Main beam 1.17-1.78 8.8kg 2.0mm
No. 1 sub beam 1.15  3.25kg 2.0mm
No. 2 sub beam 0.8  2.35kg 2.0mm
No. 3 sub beam 0.4 1.25kg 2.0mm
No. 4 sub beam  1.13 3.15kg 2.0mm
No. 5 sub beam  0.83 2.38kg 2.0mm
No. 6 sub beam  0.53 1.6kg 2.0mm

slab formwork

• Small number of individual parts
• Optimised material deployment
• For any slab thickness
• Length adjustment through overlapping of girders
• Light-weight individual parts
• Optimised adjustment to any layout
• Any formwork covering selectable
2.Product Details
XM Slab formwork has following advantages:
1.By average product usage at 10kg per square meter, it not only facilitates workers to carry materials, but also simplify the tansportation and cost saving.
2.The main beam is adjustable to suitable different sized rooms with strong versatility.
3.The main beam and sub beam are connected at the same horizontal plane, which enables the system to reach advanced stability.
4.Schtling timbers can be filled into the sub beam through the bottom.Then workers can nail plywood to the sub beam.
5.High quality cold rolled steel Q235 grade, surface treatment is finished by electrophoretic painted of better corrosion resistance.

Product Introduction
3.Why Choose Us
- - - 1. Q: What's your MOQ(minimum order quantity)?

A: One full 20ft container,mixed acceptable .

- - - 2. Q: What's your packing methods?

A: Packed in bundle or bulk (customed is accepted).

- - - 3. Q: What's your payment terms?

T/T 30% in advance by T/T ,70% will be before shipment under FOB.

T/T 30% in advance by T/T ,70% against the copy of BL under CIF.

T/T 30% in advance by T/T ,70% LC at sight under CIF.

- - - 4. Q: What's your delivery time?

A: 10-20 days after received the advance payment .

- - - 5. Q: Are you manufacturer or trader?

A: We are the manufacturer of construction materials for decade years ,xmwy Group do domestic market and export business.

- - - 6. Q: Where's your factory?

A: Our factory is in changli city (near Beijing) afforded enough production ability and earlier delivery time.

- - - 7. Q: Can we visit your factory?

A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

- - - 8. Q: Can you supply other scaffolding materials?

A: Yes. All related construction materials.

(1) scaffolding system (cup-lock system, ring lock system, scaffolding steel frame, pipe&coupler system)

(2) scaffolding pipes (1.5'-2.0')x(0.3-12m), hot dipped galvanized/Pre-galvanized /black. BS1139

(3) steel pipes (ERW steel pipes, Square/ Rectangular tube ,black annealed steel tube)

(4) steel coupler (pressed/drop forged coupler)

(5) steel plank with hooks or without hooks

(6) steel stair case

(7) screw adjustable base jack

(8) Construction Metal Formwork


4.customers visit

All in all meet customers demand in short time and provide good service for customers.
1.Provide good service and help to find the question when customers are in trouble, solve the problem as soon as i know.
2.Precise calculate drawings depends on CAD to save money. make a plan for you and let you know how to save money and let customers feel comfortable the process they plan to purchase.
3.make a quotation for customers
4.Reception customers see factory


5.contact me
Chloe Teng 
Iternational Trade Dept.
Changli XingMinWeiYe Architecture Equipment Limited Corporation