TitleProduct

Working Platform for Cold Storage

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Jiangsu

  • Validity to:

    Long-term effective

  • Last update:

    2017-09-16 07:15

  • Browse the number:

    48

Send an inquiries

Company Profile

Xinxiang City Chengben Machinery Co., Ltd.

By certification [File Integrity]

Contact:Miss Alice Pan(Mr.)  

Email:

Telephone:

Phone:

Area:Jiangsu

Address:Jiangsu

Website: http://casgyw.kskuntai.com/

Product Details


dock lever for cold storage
Lip rim loading and unloading platform
Lip rim (fold plate)unloading platform
Pneumatic loading and unloading platform

Lip rim loading and unloading platform
Lip rim unloading platform directly installed on the cargo platform front edge position. Without excavation on cargo operation platform, or reserve pit, basic structure of buildings without changes also can meet the requirements of into the truck loading and unloading cargo.
Lip rim climbing trolley also designed according to different site conditions have a variety of structural forms, also can be within a certain range up below (goods) or down (loading above) adjustment, can meet most of the cargo platform installation.
 
Lip rim (fold plate)unloading platform
Without a pit, directly used to established the platform of discharge. Easy dock with unloading platform and the car completely. To conform to the requirements of the logistics loading and unloading.
In accordance with the manual push-pull easily pry bar to the main plate surface and car lap. By the spring tension, auxiliary complete action and keep the continuity of the action.
The mechanical structure, no complex parts, such as transmission and electric, with fast and simple installation, and no maintenance and maintenance features.
No impact to the environment, more suitable for clean factory or places that have requirements of explosion-proof requirements to use.
 
Pneumatic loading and unloading platform
Advanced low pressure to promote the system to provide optimal efficiency, cylindrical tower of gas burst and wear-resisting.
To clean the bottom of the structure quickly, no need of special tools.
To load test of related standard ANSI MH30.1-2000.
The extension of two point version of coronary structure to ensure a longer service life and more smooth operation.
Integration of maintenance support bar effective support platform andextension plate, convenient maintenance.
Standard 16 "(406 mm) extension plate, provide more flexibility .
Pair of thickness of 4 "(100 mm) collision block.
8 "(200 mm) beam spacing is three rounds of forklift ideal match.
Four vertical support structure more complete.
Assurance over a five-year period pneumatic system components and artificial quality.