TitleProduct

C/F for G/Mbr S/Tirb Dall, Metal Parts

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Guangdong

  • Validity to:

    Long-term effective

  • Last update:

    2017-10-30 14:33

  • Browse the number:

    230

Send an inquiries

Company Profile

Dongguan Haida Equipment Co., Ltd.

By certification [File Integrity]

Contact:Mr. Fengbo Cheng(Mr.)  

Email:

Telephone:

Phone:

Area:Guangdong

Address:Guangdong

Website: http://dgxiesheng.kskuntai.com/

Product Details


Product Description
The materials is used 6061(for the basis) and some fiber carbon for skeleton and Bakelite materials 5166 (for the surface) and others.The leadtime will be in 30 days according to the complicated of the configuration and the design confirmation.It is used the wooden crate for the checking fixture.could ship via DHL and other forwarder on the customer requirement.

1.What about the working flow?
Received the purchasing order------Design------Confirming the drawing/solutions------Prepare the materials------CNC------CMM------assembling------CMM------Inspecting------(3rd parts inspections if need)------Package(with wooden)------delivery

2.What is the lead time for the product after confirm the drawing?
Normally,the leadtime is 15-25days,for specially complicate parts,the lead time will be 45days.

3.What kinds of software could support for design?
UG8.0,UG10.0,Catia V5 for 3D,CAD 2007 for 2D.
4..What about the machines?
Machine list is below:
NO Name Brand/manufacturer  Type Quantities(Set) Remark
1 CNC Dingtai 850 4  
2 CNC Goodly 1050 2  
3 CNC Hartford 1580 1  
2 lathe Guangzhou C6132A 4  
3 Milling  Kunlun 4 8  
4 Grinder HYFAIR   4  
5 CMM Leader   2  
6 CMM Sirui   1  
7 CMM China   1