PVC Marble Sheet Extrusion Machine / PVC Marble Sheet Extrusion Line
BRIEF INSTRUCTION
PVC Artificial Marble Board Production Line is made and designed by our company through many years experience involving in manufacutrring PVC free foamed board production line and PVC Artificial Marble Board .
PHOTOS OF PVC ARTIFICAL MARBLE BOARD
MAIN APPLICATION OF BOARD
Decoration :such as indoor floor / wall panel etc.
Advantages of PVC Artificial Marble Board
1, Environment friendly
2, Recycled available
3, Water proof
4, Anti-corrosion
5, Deformation hard .
FLOW CHART OF PRODUCING
Crusher (crushing the edge of board trimmed) → Miller (milling the scraps into powder → Mixer (mixing the main materials and additives) → SJSZ 80- 156 Twin Conical Screws Extruder → Mould → Lamination unit → Three-calender unit → Cooling Bracket → Hual-off Machine → Edge Cutting → Cutter → Stacker .
CONFIGURATION
Components |
Amount |
1,Conical double screw extruder SJSZ-80/156 |
1 set |
2,Extruder Mould |
1 set |
3,Three-calender |
1 set |
4,Cooling bracket |
1 set |
5,Haul-off unit |
1 set |
|
|
6, Dropper for the finished product |
1 set |
7, Control system |
1 set |
Phtoto of Whole Line
Main Parts
1,Conical double screw extruder SJSZ-80/156
2,Extruder Mould
3,Three-calender unit
4,Cooling bracket
5, Haul-off unit
6, Cutter & Stacker
Auxiliary Equipments
1, Crusher
Application : crushing the edge trimmed from PVC WPC Foam Board into scraps .
2, Miller
Appication milling the PVC WPC Foam Scraps into powder
3, Mixer
Application : mixing the main materials with other addtives
4, Air Storage Tank
Application : storaging the tank for air cylinder
5, Compressor
Application : producing the air for air cylinder
After Sales Services
1, Final commissioning and training at buyer's factory.
2, The seller will send 2 or 3 engineers to make the final commissioning and training. All the charges (round air ticket charge, food, lodging and other local charges) have to be borne by the buyer.
3, US$ 100 for each engineer per day out of China should be paid by buyer
4, Both parties will negotiated the time for the final inspection and training according to the conditions between both sides.
FACTORY PHOTOS